OBJECTIVE
To lay down procedures for the operation and cleaning of Fitzmill.
SCOPE
The procedure applies to Fitzmill in the production area.
RESPONSIBILITY
Operator: To operate and clean equipment
Supervisor: To ensure the procedure is appropriately followed.
PROCEDURE
- Assemble various parts of the Fitzmill including the appropriate sieve mesh screen as stipulated by the batch record.
- Fit the sieving bag to the milling part of the Fitzmill.
- Fit the sieving bag to the container receiving the milled powder.
- Load the powder into the hopper, using a stainless steel scoop.
- Switch on the three-phase mains.
- Based on the batch record instructions, slowly push the powder into the milling section using slow speed with 1 belt or high speed with 2 belts.
- Collect the milled powder in the pre-tared plastic containers.
- Weigh the milled powder before sending it for mixing.
- After completion disassemble the machine parts and clean them.
- Dedust with a vacuum cleaner.
- When changing from one product to another, remove and change the sieving bags.
- The sieving bag should be cleaned as per SOP.
REVISION HISTORY
Nil
0 Comments