SOP for Operation and Cleaning of Turn Table

OBJECTIVE
To lay down a standard operation and cleaning of the Turntable.

SCOPE
The procedure applies to the Turn table located in PharmaInfo Limited.

RESPONSIBILITY
Operator: Operation and cleaning of the machine.
Supervisor: To ensure the procedure is appropriately followed.
QA. Personnel: For routine and preventive maintenance

PROCEDURE
Operation
  • Check cleanliness to Turn table and area.
  • Fix the status label for the next product.
  • Connect the power supply to the machine.
  • Switch on the main power supply to electrical components by putting the “ON/OFF” toggle switch in on position.
  • Start the machine with the “MACHINE START” push button.
  • Set the machine speed as per requirement by the “SPEED” pot switch.



  • Check the direction of rotation of the turn table disc. If it is not as per requirement, then change it by changing the phase sequence of two of the three connections (R, Y, B) of the main driver motor.
  • Stop the machine with the “MACHINE STOP” push button when you want to stop it.
  • Switch off the main power supply after stopping the machine at the end of the shift.
  • Record the details in the logbook.

Cleaning
  • Switch off the main power supply.
  • Clean the machine daily or after every batch with a clean cloth.
  • Lubricants all driving chains, gears, bushes, sprockets, etc. with the help of Grease and/or oil weekly.
  • Record the details in the logbook.

ABBREVIATION
QC: Quality Control

ANNEXURE
Nil

REVISION HISTORY
Nil