To lay down a procedure for the operation of the induction sealing machine.
SCOPE
This procedure applies to the production department in the Pharmaceutical Manufacturing Facilities Formulation division.
RESPONSIBILITY
- The concerned operator is responsible for the implementation of the process.
- The Production In-Charge is responsible for the execution and compliance of the procedure.
PROCEDURE
- Ensure that the machine is clean and free from the traces of previous products.
- Ensure that line clearance is taken.
- Adjust the height of the sealing head plate by rotating the back knob; to the required height of the container, which is to be induction sealed.
- Adjust the heat timer to 3 to 5 seconds as per the requirement.
- Place the container locked with a cap below the induction sealing head plate.
- Press the START switch to start the sealing.
- Check the sealing quality along with the approval of the in-process Quality Assurance person.
- Start the further activity.
- Maintain the proper labeling at each stage.
- All the operation details shall be entered in the equipment usage log book.
ABBREVIATION
Q.A - Quality Assurance
SOP - Standard Operating Procedure
No. - Number
P.D - Production
ANNEXURE
Nil
REVISION HISTORY
Nil