Purpose
To provide a documented procedure for Restart the Activities After Power Failure / Breakdown
Objective
Procedure For Restart The Activities After Power Failure / Breakdown
Responsibility
Primary: Technician Engineering
Secondary: Manager Engineering
Procedure
Power failure
- Check the main power circuit panel for voltage and breakdown.
- Start the D.G. Set and check the voltage and frequency, it should be 430 V and 50 HZ
- Then changeover the power supply from the main power supply to D.G. Set for normal operation.
- After resuming the power supply from the main power supply check the voltage and frequency.
- Before changing over the power supply from D.G. Set power supply inform the critical Processing areas personnel and switch the power supply for normal working.
Breakdown
- In case of a breakdown of the power supply, confirm the nature of the breakdown.
- Start the D.G. Set
- Check the voltage and frequency; it should be 430 V & 50 HZ.
- Change over the power supply from the main power supply to D.G. Set for normal working.
- After attending to the breakdown of the power supply, restore the power supply and check the voltage and frequency of the mains.
- Before changing over the power supply from D.G. Set to the main power supply inform critical activities area personnel for normal working.
Abbreviation
D.G.: Diesel Generator
Annexure
Nil