SOP for Restart the Activities after Power Failure / Breakdown

Purpose
To provide a documented procedure for Restart the Activities After Power Failure / Breakdown

Objective
Procedure For Restart The Activities After Power Failure / Breakdown

Responsibility
Primary: Technician Engineering
Secondary: Manager Engineering

Procedure
Power failure
  • Check the main power circuit panel for voltage and breakdown.
  • Start the D.G. Set and check the voltage and frequency, it should be 430 V and 50 HZ
  • Then changeover the power supply from the main power supply to D.G. Set for normal operation.
  • After resuming the power supply from the main power supply check the voltage and frequency.
  • Before changing over the power supply from D.G. Set power supply inform the critical Processing areas personnel and switch the power supply for normal working.


Breakdown
  • In case of a breakdown of the power supply, confirm the nature of the breakdown.
  • Start the D.G. Set
  • Check the voltage and frequency; it should be 430 V & 50 HZ.
  • Change over the power supply from the main power supply to D.G. Set for normal working.
  • After attending to the breakdown of the power supply, restore the power supply and check the voltage and frequency of the mains.
  • Before changing over the power supply from D.G. Set to the main power supply inform critical activities area personnel for normal working.

Abbreviation
D.G.: Diesel Generator

Annexure
Nil