OBJECTIVE
To lay down a procedure to update the Equipment Status for each operation during day-to-day work.
SCOPE
This SOP shall apply to the equipment used in the Quality Control Laboratory during analysis at PharmaInfo Limited.
RESPONSIBILITY
Execution: Chemist and above – QC department.
Checking: Asst. Manager and above – QC department
PROCEDURE
- The Logbook for instruments should be prepared as per Annexure - 1.
- Log books should be kept near the respective instrument/equipment upon issuance.
- During the operation of instrument/equipment, record the details in the respective instrument/equipment log book.
- All the respective instrument/equipment log book entries shall be done online.
- Any missed or late entry in the respective instrument/equipment log book shall be done on the current date and shall be checked by a supervisor.
- All the entries in the instrument/equipment log book shall be done correctly and written clearly. In case of any mistake, one shall make a single line cut and write again correctly along with the sign and date.
REFERENCE
Nil
ABBREVIATION
SOP: Standard Operating Procedure
QC: Quality Control
ANNEXURE
Annexure No. – 1: Instrument log book
REVISION HISTORY
Nil
0 Comments