SOP for Operation and Calibration of Conductivity Meter

OBJECTIVE 
To lay down the procedure for the Operation and Calibration of the Conductivity Meter for better and error-free use. 

SCOPE 
This procedure applies to the Conductivity Meter, installed in the Quality Control department at Pharmainfo Limited 

RESPONSIBILITY 
Chemist and above - QC department. 
Checking: Asst. Manager and above - QC department.


PROCEDURE 
Operational Procedure 
  • Switch on the mains. 
  • Switch on the ‘POWER’. 
  • The display shows ‘count in μs/cm ’. 
  • Rinse with distilled water and dry it with tissue paper. 
  • Ensure that before using the conductivity meter, it should be calibrated. 
  • Immerse both probes in the solution to be measured. 
  • After a while, the unit will display the temperature and conductivity of the solution in micro siemens/millisiemens units. 
  • On completion remove the conductivity cell and temperature probe from the test solution. 
  • Rinse the conductivity cell and temperature probe with distilled water and dry it with tissue paper. 
  • Keep the cell immersed in distilled water in between and after the measurement. 
  • Switch “OFF” the mains.          

Calibration Procedure
Frequency: Daily 
  • Rinse the conductivity cell and temperature probe with distilled water and dry it with tissue paper. 
  • Dip the conductivity cell in 0.001 M Std. KCl solution 
  • Check the standard conductivity switch is in an upward position so that the full range of display is read. 
  • Record the observation in Annexure-1 and if necessary turn the ‘standardize’ shaft with a screwdriver to get the correct conductance of the solution. 

REFERENCE
Nil 


ANNEXURE
Annexure No. - 1:  Calibration report of conductivity meter

ABBREVIATION
SOP: Standard Operating Procedure 
Q.A: Quality Assurance 
No. : Number 
Q.C: Quality control 
hr: Hour 
KCl: Potassium Chloride 
Std. : Standard 

REVISION HISTORY
Nil