Ad Code

SOP for Retesting Schedule of Raw Material

OBJECTIVE
To lay down a procedure to ensure compliance of approved raw materials at regular intervals during storage 

SCOPE
This SOP shall be applicable for all approved raw materials which are stored in the raw material store. 

RESPONSIBILITY
Implementation: Chemist and above Quality Control department. 
Checking: Asst. Manager and above Quality Control department 

PROCEDURE
  • All active and inactive raw materials shall be retested after one year from the date of release.
  • Intimation shall be received from the store one month in advance for the material due for retesting.
  • After the receipt of the re-testing intimation slip from the store department, QC Chemist shall make its entry in the respective Re-testing logbook.
  • Affix the “UNDER RETEST” label on each container and cross out the “APPROVED” label with a marker on all the containers.
  • Sample the Raw material as per the current version of SOP. (Sampling plan of raw Material).
  • Carry out the following test for each raw material as applicable.
  1. Description
  2. LOD/Water content
  3. Chromatographic purity/Related substances
  4. Assay
  5. pH
  6. Acidity / Alkalinity test
  • Prepare the retest report, check and get it signed by QC Manager or his/her designee.
  • Affix the “APPROVED” label with the new retesting date on all the containers.
  • If the material is rejected, Affix the “REJECTED” label on each container.

ABBREVIATION
SOP: Standard Operating Procedure 
No.: Number 
LOD: Loss on drying 
QC: Quality control

ANNEXURE
Nil

REVISION HISTORY
Nil

ALSO READ: 
SOP for Sampling Plan of Raw Materials

Post a Comment

0 Comments

Close Menu
close