Ad Code

SOP for Handling of Returned Material/Products

PURPOSE
To Lay down systematic procedures to establish handling of returned material/ products from the market.

SCOPE
This method is applicable for handling returned material/products from the market.

RESPONSIBILITY
Production Head
Tech. Director
Head Quality Assurance

ACCOUNTABILITY
Head Quality Assurance


PROCEDURE
  • Any material or goods (Finished products &/or intermediates) returned from the market shall be stored in a separate area dedicated to storing returned goods.
  • Record all the details in the Returned Goods Record, as per Annexure II.
  • Inform the Quality Assurance department for evaluation of the returned goods.
  • The Quality Assurance chemist shall evaluate the returned goods for the following:
  1. Check the COA and other documents with the returned consignment.
  2. Condition of the Packaging, carton, and container.
  3. Labeling details.


  • If the returned materials have exceeded the labeled expiry period &/or the condition of the packaging, carton, container, and storage condition of the material before returning/ shipping are doubtful, then destroy the material as per the SOP for control sample destruction.
  • If none of the above conditions is apparent, then sample the material as per the SOP for sampling the Finished Products.
  • Analyze the sample as per the currently approved product specification. Suppose the product meets the appropriate product specification. In that case, the returned material/ product may be considered for reprocessing as per the SOP for reprocessing, provided the subsequent product meets the product specification.
  • In case the sample fails to meet the product specification, destroy the material/product as per the SOP for destruction, and initiate a failure investigation.
  • Identify the batches manufactured during the same period &/or manufactured by using the same RM’s. Extend the investigation to these batches also.
  • Refer flow chart for the handling of the returned material/ products as per Annexure I.


REFERENCES
NIL

ANNEXURES
Annexure I - FLOW CHART OF HANDLING OF RETURNED MATERIAL/PRODUCT
Annexure II - RETURNED MATERIAL/ PRODUCT RECORD


ABBREVIATIONS
SOP: Standard Operating Procedure
QA: Quality Assurance
COA: Certificate of Analysis
FG: Finished good

REVISION HISTORY
Nil

Post a Comment

0 Comments

Close Menu
close